. Recent drilling has extended both near-surface supergene and primary high grade mineralization at the Aquarius Project, outlining a potentially economic starter pit ahead of mining higher grades underground Supergene mineralization1 KAQRC039: 5 g/t over 3.0 metres KAQRC015: 7 g/t over 6.0 metres, including 14.6g/t over 2.0 metres Primary mineralization1 KAQRC032: 7 g/t over 3.5 […]
continue reading